This project involved extensive leveling of the floors throughout the apartment. The
apt. was gutted to the bearing walls and floor joists. New plumbing and electrical
circuits were installed along with the new carpentry, sheet rock,
appliances and cabinetry. The construction time for this job was just over 12 weeks.
Total cost for this job was $80,000.
This project involved updating a small NYC studio apt. (325 Sq ft).
The original layout had very little lighting, a 2 piece bathroom, and
very little cabinetry. New electrical service was brought to the apt.,
along with recessed low voltage halogen lighting in the ceilings throughout. A modern three piece bathroom was installed, as well as an efficient, neat galley style kitchen. Total cost for this project was $60,000.
This project began with small outdated kitchen, a small bedroom near the entry of the apartment, and a
two piece bathroom.The apt. was gutted throughout. The small bedroom was moved to the rear of the apt. A new modern kitchen was installed with an open dining area where the old bedroom once was. A new bathroom with a sink, a toilet and custom shower stall replaced the old one. Total cost = $110,000.